Item |
Description |
Previous month
MAY 2019 |
This Month
JUNE 2019 |
Next to Month
JULY 2019 |
1 |
INITIAL WORKS |
|
|
|
|
Mobilization |
100.00% |
|
100.00% |
|
Setting
Out |
100.00% |
|
100.00% |
|
Site
clearing, grading area for temporary facilities |
100.00% |
|
100.00% |
|
Temporary
access road and drainage |
100.00% |
|
100.00% |
|
|
100.00% |
|
100.00% |
2 |
CONSTRUCTION
FACILITIES AND TEMPORARY WORKS |
100.00% |
|
100.00% |
|
Temporary
site office for Pisnoka (1 container 24 feet, rental fee) |
100.00% |
|
100.00% |
|
Temporary
storage (2 container 24 feet, rental fee) |
100.00% |
|
100.00% |
|
Labor
camps/domitory (Land area provided by clients, camp) |
100.00% |
|
100.00% |
|
Accomdation
for managers and supervisors (home rental) |
100.00% |
|
100.00% |
|
Temporary
guard house (1 labor camp, 1 at job site) |
100.00% |
|
100.00% |
|
Temporary
toilet for labors (3mx5m) |
100.00% |
|
100.00% |
|
Temporary
toilet for staff |
100.00% |
|
100.00% |
|
Temporary
workshop for rebar(12mx10m) |
100.00% |
|
100.00% |
|
Temporary
workshop for formwork(12mx10m) |
100.00% |
|
100.00% |
|
Temporary
parking area |
100.00% |
|
100.00% |
|
Grand House |
|
|
|
I. |
STRUCTURAL
WORKS-follow new update structural drawing |
100.00% |
|
100.00% |
A. |
Piling
Works |
100.00% |
|
100.00% |
1 |
PC
Pile 300x300mm , Bottom pile L= 23.0m depth |
100.00% |
|
100.00% |
2 |
Pile
top cut-off for PC Pile 300mmx300mm as required level |
100.00% |
|
100.00% |
B. |
Earthwork-follow new update structural drawing |
100.00% |
|
100.00% |
1 |
Soil
excavation for slab, lift pit, pile cap, underground beam, water tank |
100.00% |
|
100.00% |
2 |
Sandy
backfilling and compaction |
100.00% |
|
100.00% |
3 |
soil
Disposal |
100.00% |
|
100.00% |
4 |
Lean
concrete,50mm thk (pile cap, ground beam and ground floor slab, water tank) |
100.00% |
|
100.00% |
5 |
Compacted
coarse sand/crushed stone M30, thk100mm |
100.00% |
|
100.00% |
6 |
Plastic
sheet |
100.00% |
|
100.00% |
7 |
Anti-Termite
Granules (slab) |
100.00% |
|
100.00% |
C. |
Substructure
Concrete Works- follow new update structural drawing |
100.00% |
|
100.00% |
1 |
Concrete:
fcyl=28MPa |
100.00% |
|
100.00% |
|
RC
pile cap |
100.00% |
|
100.00% |
|
RC
stump column |
100.00% |
|
100.00% |
|
RC
wall lift pit |
100.00% |
|
100.00% |
|
Water
tank (10.70x10.60m - H=1.450) |
100.00% |
|
100.00% |
D. |
Supertructure
Concrete Works |
100.00% |
|
100.00% |
|
Floor
Level 1 (Ground ) |
100.00% |
|
100.00% |
1 |
Concrete:
fcyl=28MPa |
100.00% |
|
100.00% |
|
RC
Beam |
100.00% |
|
100.00% |
|
RC
slab |
100.00% |
|
100.00% |
|
RC
column |
100.00% |
|
100.00% |
|
RC
wall |
100.00% |
|
100.00% |
|
RC
at loading are (Ramp) |
100.00% |
|
100.00% |
|
RC
Parapet Wall thk=100mm for molding |
100.00% |
|
100.00% |
|
RC
Internal Staircase |
100.00% |
|
100.00% |
|
RC
External Staircase including brick wall support |
100.00% |
|
100.00% |
|
brick
10cm support concrete |
100.00% |
|
100.00% |
|
brick
20cm support concrete |
100.00% |
|
100.00% |
4 |
Post
Tension Cable |
100.00% |
|
100.00% |
|
Floor
Level 2 |
100.00% |
|
100.00% |
|
RC
Beam |
100.00% |
|
100.00% |
|
RC
slab |
100.00% |
|
100.00% |
|
RC
column |
100.00% |
|
100.00% |
|
RC
wall |
100.00% |
|
100.00% |
|
RC
Parapet Wall thk=100mm for molding |
100.00% |
|
100.00% |
|
RC
Staircase |
100.00% |
|
100.00% |
|
RC
Gutter |
100.00% |
|
100.00% |
4 |
Post
Tension Cable |
100.00% |
|
100.00% |
|
Floor
Level 3 |
100.00% |
|
100.00% |
|
RC
Beam |
100.00% |
|
100.00% |
|
RC
slab |
100.00% |
|
100.00% |
|
RC
column |
100.00% |
|
100.00% |
|
RC
wall |
100.00% |
|
100.00% |
|
RC
Parapet Wall thk=100mm for molding |
100.00% |
|
100.00% |
|
RC
Gutter |
100.00% |
|
100.00% |
4 |
Post
Tension Cable |
100.00% |
|
100.00% |
|
Roof
Floor Level 3 |
100.00% |
|
100.00% |
|
RC
Beam |
100.00% |
|
100.00% |
|
RC
Parapet Wall thk=100mm for molding |
100.00% |
|
100.00% |
|
RC
Gutter |
100.00% |
|
100.00% |
E. |
Structural
Steel Works |
100.00% |
|
100.00% |
|
Roof
level 1 |
100.00% |
|
100.00% |
1 |
Roof
tile |
100.00% |
|
100.00% |
2 |
Purlin |
100.00% |
|
100.00% |
|
Roof
level 2 |
100.00% |
|
100.00% |
1 |
Roof
tile |
100.00% |
|
100.00% |
2 |
Purlin |
100.00% |
|
100.00% |
|
Roof
level 3 |
100.00% |
|
100.00% |
1 |
Roof
tile |
100.00% |
|
100.00% |
2 |
Purlin |
100.00% |
|
100.00% |
II. |
ARCHITECTURAL
WORKS |
|
|
|
A |
Masonry
works |
|
|
|
|
Floor
Level 1 (Ground ) |
|
|
|
1 |
Single
layer of Brick Wall 75mm thick masonry hollow brick wall with solid brick
cross laid |
10.00% |
10.00% |
20.00% |
2 |
Double
layers of brick wall 75mm thk. |
10.00% |
10.00% |
20.00% |
3 |
Double
layers of brick wall 75mm thk. with air space 20cm. |
10.00% |
10.00% |
20.00% |
4 |
Lintel/stud
column for brick wall length > 4m, height >4m, wall end, & wall
corner |
10.00% |
10.00% |
20.00% |
|
horizontal
lintel 100x120mm for single brick 75mm |
10.00% |
10.00% |
20.00% |
|
Vertical
lintel 100x400mm for double brick 75mm with air space 200mm |
10.00% |
10.00% |
20.00% |
|
Floor
Level 2 |
|
|
|
1 |
Single
layer of Brick Wall 75mm thick masonry hollow brick wall with solid brick
cross laid |
0.00% |
0.00% |
0.00% |
2 |
Double
layers of brick wall 75mm thk. |
0.00% |
0.00% |
0.00% |
3 |
Double
layers of brick wall 75mm thk. with air space 20cm. |
0.00% |
0.00% |
0.00% |
4 |
Lintel/stud
column for brick wall length > 4m, height >4m, wall end, & wall
corner |
0.00% |
0.00% |
0.00% |
|
horizontal
lintel 100x120mm for single brick 75mm |
0.00% |
0.00% |
0.00% |
|
Floor
Level 3 |
0.00% |
0.00% |
0.00% |
1 |
Single
layer of Brick Wall 75mm thick masonry hollow brick wall with solid brick
cross laid |
0.00% |
0.00% |
0.00% |
2 |
Double
layers of brick wall 75mm thk. |
0.00% |
0.00% |
0.00% |
3 |
Double
layers of brick wall 75mm thk. with air space 20cm. |
0.00% |
0.00% |
0.00% |
4 |
Lintel/stud
column for brick wall length > 4m, height >4m, wall end, & wall
corner |
0.00% |
0.00% |
0.00% |
|
horizontal
lintel 100x120mm for single brick 75mm |
0.00% |
0.00% |
0.00% |
B |
Plastering
works |
|
|
|
|
Floor
Level 1 (Ground ) |
0.00% |
0.00% |
0.00% |
1 |
Internal
plastering 15mm thk. for wall, opening area, column |
0.00% |
0.00% |
0.00% |
2 |
External
plastering 15mm thk. for brick wall, column |
0.00% |
0.00% |
0.00% |
|
Floor
Level 2 |
0.00% |
0.00% |
0.00% |
1 |
Internal
plastering 15mm thk. for wall, opening area, column |
0.00% |
0.00% |
0.00% |
2 |
External
plastering 15mm thk. for brick wall, column |
0.00% |
0.00% |
0.00% |
|
Floor
Level 3 |
0.00% |
0.00% |
0.00% |
1 |
Internal
plastering 15mm thk. for wall, opening area, column |
0.00% |
0.00% |
0.00% |
2 |
External
plastering 15mm thk. for brick wall, column |
0.00% |
0.00% |
0.00% |
C |
Floor/wall
tile works/Skirting |
|
|
|
|
Labor cost only :
cement mortar is included; excluded tile material & tile joint grouting ,
tile adhesive-glue |
|
|
|
|
Floor 1 |
|
|
|
|
F8,F12,F13,-Ceramic
floor tile 600x600 |
0.00% |
0.00% |
0.00% |
|
F6,F7-Ceramic
floor tile 300x300 |
0.00% |
0.00% |
0.00% |
|
3,
5- Ceramic wall tile 300X300;300X600 |
0.00% |
0.00% |
0.00% |
|
Ceramic
tile for stair |
0.00% |
0.00% |
0.00% |