Site Daily Report
Project:
LYP’s Residence
Contractor: PISNOKA International Corporation
Date: 23-July-2019
No: LYP-280
Average number of workers
Management : 1
Supervisor/ Engineers : 3
HSE : 2
MEP Staff : 2
Archicture : 1
Office Staff : 2
Un-skilled : 150
Sub Contractor : 30
Equipment
- Wheel Loader (1)
- 25 Ton Crane
(1)
- 55 Ton Crane
(1)
- Roller (1)
- Bulldozer (1)
- Dumping truck
(1)
- Excavator
- Tower Crane
Machinery on site:
-Cutting machine gas (2)
-Grinding machine (3)
-Cutting motor (9)
-Generator GT 60 kva (1)
-Generator GT 30 kva (2)
-Generator GT 150 kva (1)
-Generator GT 250 kva (1)
-Flat compactor (4)
Works Carried Out:
1)
Temporary
site facility
- Temporary Work Camp
- Temporary House keeping
2)
Security
House I&II
·
Bricklaying
for Molding
·
Plastering
for Molding
·
Steel
Structure Work
3)
Car
Parking, I&II
·
Brick
Laying
·
Plastering
Work
·
Apply
Waterproofing of Gutter
·
Steel
Structure Work
4)
Dinning
Pool
Steel Structure Work for roof tile
5)
Grand
House
·
Bricklaying
·
Remove
Formwork of Second Floor Beam
·
Install
Rebar and Formwork of Lintel
·
Installation
Scaffolding for Supporting First Floor Beam
·
Cleaning
Surface Concrete gutter
·
Apply
Waterproofing (Brush Bound)
·
Mortar
Topping with Slope of Roof Gutter
·
Casting
Concrete of First Floor Beam
6)
Fitness