Showing posts with label Monthly Report. Show all posts
Showing posts with label Monthly Report. Show all posts

Saturday, August 17, 2019

Monthly Report

 Click here for Download file Monthly Progress Report















Item Description  Previous month
MAY 2019 
 This Month
JUNE 2019 
 Next to Month
JULY 2019 
1 INITIAL WORKS



Mobilization 100.00%
100.00%

Setting Out 100.00%
100.00%

Site clearing, grading area for temporary facilities 100.00%
100.00%

Temporary access road and drainage 100.00%
100.00%


100.00%
100.00%
2 CONSTRUCTION FACILITIES AND TEMPORARY WORKS 100.00%
100.00%

Temporary site office for Pisnoka (1 container 24 feet, rental fee) 100.00%
100.00%

Temporary storage (2 container 24 feet, rental fee) 100.00%
100.00%

Labor camps/domitory (Land area provided by clients, camp) 100.00%
100.00%

Accomdation for managers and supervisors (home rental) 100.00%
100.00%

Temporary guard house (1 labor camp, 1 at job site) 100.00%
100.00%

Temporary toilet for labors (3mx5m) 100.00%
100.00%

Temporary toilet for staff 100.00%
100.00%

Temporary workshop for rebar(12mx10m) 100.00%
100.00%

Temporary workshop for formwork(12mx10m) 100.00%
100.00%

Temporary parking area 100.00%
100.00%

Grand House


I. STRUCTURAL WORKS-follow new update structural drawing 100.00%
100.00%
A. Piling Works 100.00%
100.00%
1 PC Pile 300x300mm , Bottom pile L= 23.0m depth 100.00%
100.00%
2 Pile top cut-off for PC Pile 300mmx300mm as required level 100.00%
100.00%
B. Earthwork-follow new update structural drawing 100.00%
100.00%
1 Soil excavation for slab, lift pit, pile cap, underground beam, water tank 100.00%
100.00%
2 Sandy backfilling and compaction 100.00%
100.00%
3 soil Disposal 100.00%
100.00%
4 Lean concrete,50mm thk (pile cap, ground beam and ground floor slab, water tank) 100.00%
100.00%
5 Compacted coarse sand/crushed stone M30, thk100mm 100.00%
100.00%
6 Plastic sheet 100.00%
100.00%
7 Anti-Termite Granules (slab) 100.00%
100.00%
C. Substructure Concrete Works- follow new update structural drawing 100.00%
100.00%
1 Concrete: fcyl=28MPa 100.00%
100.00%

RC pile cap 100.00%
100.00%

RC stump column 100.00%
100.00%

RC wall lift pit 100.00%
100.00%

Water tank (10.70x10.60m - H=1.450) 100.00%
100.00%
D. Supertructure Concrete Works 100.00%
100.00%

Floor Level 1 (Ground ) 100.00%
100.00%
1 Concrete: fcyl=28MPa 100.00%
100.00%

RC Beam 100.00%
100.00%

RC slab 100.00%
100.00%

RC column 100.00%
100.00%

RC wall 100.00%
100.00%

RC at loading are (Ramp) 100.00%
100.00%

RC Parapet Wall thk=100mm for molding 100.00%
100.00%

RC Internal Staircase 100.00%
100.00%

RC External Staircase including brick wall support 100.00%
100.00%

brick 10cm support concrete 100.00%
100.00%

brick 20cm support concrete 100.00%
100.00%
4 Post Tension Cable 100.00%
100.00%

Floor Level 2 100.00%
100.00%

RC Beam 100.00%
100.00%

RC slab 100.00%
100.00%

RC column 100.00%
100.00%

RC wall 100.00%
100.00%

RC Parapet Wall thk=100mm for molding 100.00%
100.00%

RC Staircase 100.00%
100.00%

RC Gutter 100.00%
100.00%
4 Post Tension Cable 100.00%
100.00%

Floor Level 3 100.00%
100.00%

RC Beam 100.00%
100.00%

RC slab 100.00%
100.00%

RC column 100.00%
100.00%

RC wall 100.00%
100.00%

RC Parapet Wall thk=100mm for molding 100.00%
100.00%

RC Gutter 100.00%
100.00%
4 Post Tension Cable 100.00%
100.00%

Roof Floor Level 3 100.00%
100.00%

RC Beam 100.00%
100.00%

RC Parapet Wall thk=100mm for molding 100.00%
100.00%

RC Gutter 100.00%
100.00%
E. Structural Steel Works 100.00%
100.00%

Roof level 1 100.00%
100.00%
1 Roof tile 100.00%
100.00%
2 Purlin 100.00%
100.00%

Roof level 2 100.00%
100.00%
1 Roof tile 100.00%
100.00%
2 Purlin 100.00%
100.00%

Roof level 3 100.00%
100.00%
1 Roof tile 100.00%
100.00%
2 Purlin 100.00%
100.00%
II. ARCHITECTURAL WORKS


A Masonry works



Floor Level 1 (Ground )


1 Single layer of Brick Wall 75mm thick masonry hollow brick wall with solid brick cross laid 10.00% 10.00% 20.00%
2 Double layers of brick wall 75mm thk. 10.00% 10.00% 20.00%
3 Double layers of brick wall 75mm thk. with air space 20cm. 10.00% 10.00% 20.00%
4 Lintel/stud column for brick wall length > 4m, height >4m, wall end, & wall corner 10.00% 10.00% 20.00%

horizontal lintel 100x120mm for single brick 75mm 10.00% 10.00% 20.00%

Vertical lintel 100x400mm for double brick 75mm with air space 200mm 10.00% 10.00% 20.00%

Floor Level 2


1 Single layer of Brick Wall 75mm thick masonry hollow brick wall with solid brick cross laid 0.00% 0.00% 0.00%
2 Double layers of brick wall 75mm thk. 0.00% 0.00% 0.00%
3 Double layers of brick wall 75mm thk. with air space 20cm. 0.00% 0.00% 0.00%
4 Lintel/stud column for brick wall length > 4m, height >4m, wall end, & wall corner 0.00% 0.00% 0.00%

horizontal lintel 100x120mm for single brick 75mm 0.00% 0.00% 0.00%

Floor Level 3 0.00% 0.00% 0.00%
1 Single layer of Brick Wall 75mm thick masonry hollow brick wall with solid brick cross laid 0.00% 0.00% 0.00%
2 Double layers of brick wall 75mm thk. 0.00% 0.00% 0.00%
3 Double layers of brick wall 75mm thk. with air space 20cm. 0.00% 0.00% 0.00%
4 Lintel/stud column for brick wall length > 4m, height >4m, wall end, & wall corner 0.00% 0.00% 0.00%

horizontal lintel 100x120mm for single brick 75mm 0.00% 0.00% 0.00%
B Plastering works



Floor Level 1 (Ground ) 0.00% 0.00% 0.00%
1 Internal plastering 15mm thk. for wall, opening area, column 0.00% 0.00% 0.00%
2 External plastering 15mm thk. for brick wall, column 0.00% 0.00% 0.00%

Floor Level 2 0.00% 0.00% 0.00%
1 Internal plastering 15mm thk. for wall, opening area, column 0.00% 0.00% 0.00%
2 External plastering 15mm thk. for brick wall, column 0.00% 0.00% 0.00%

Floor Level 3 0.00% 0.00% 0.00%
1 Internal plastering 15mm thk. for wall, opening area, column 0.00% 0.00% 0.00%
2 External plastering 15mm thk. for brick wall, column 0.00% 0.00% 0.00%
C Floor/wall tile works/Skirting



Labor cost only : cement mortar is included; excluded tile material & tile joint grouting , tile adhesive-glue



Floor 1



F8,F12,F13,-Ceramic floor tile 600x600 0.00% 0.00% 0.00%

F6,F7-Ceramic floor tile 300x300 0.00% 0.00% 0.00%

3, 5- Ceramic wall tile 300X300;300X600 0.00% 0.00% 0.00%

Ceramic tile for stair 0.00% 0.00% 0.00%